<?xml version="1.0" encoding="windows-1252"?>
<rss xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" version="2.0">
  <channel>
    <title>Quality Control Manual (619-590-1569 Government Contracting Consulting)</title>
    <description> 
Companies interested in maintaining good quality control, should have
a Quality System equal to the call outs in this basic Q. C. Manual , as
a mininum.
This is an excellent starter system and will adjust easily to most any 
product or service company. It is not over complicated and you do not
have to be a Government contractor to use it. 
You can simply slip your company name in, and you have a manual that
will help qualify your company to prime contractors, commercial 
customers and to the Government direct, however, you'll have to 
implement the call outs in the system first. You can delete sections that 
don't pertain to you, and add new ones following our easy format. 
We think this is a simple, low cost, straight forward system and we
hope you agree. It has 70 pages with 10 sections, including Forms,
Charts and example Tags, covering all areas of control.
Take a look around. 
policy, scope, quality system management, drawings/specifications,
control of purchases, manufacturing control, government/contractor,
exhibits, calibration procedures, spc, order now, qcmanual@indieview.com
Copyright © 2006 indieview.com. All rights reserved.</description>
    <link>http://indieview.com</link>
    <docs>http://indieview.com</docs>
    <language>en-us</language>
    <lastBuildDate>Sun, 5 Feb 2006 2:47:04 -0800</lastBuildDate>
    <pubDate>Fri, 5 August 2005 08:49:28 -0800</pubDate>
    <generator>FeedForAll v1.0 (1.0.1.0) unlicensed version</generator>

    <item>
      <title>Attention Small Business "Government Contracts Direct"</title>
      <description>Government Contracts Consulting Service</description>
      <link>http://www.governmentcontractsconsulting.com</link>
      <enclosure url="http://www.governmentcontractsconsulting.com/consult/consultnow.mp3"       		      length="387973"               type="audio/mpeg"></enclosure>
      <pubDate>Wed, 01 Feb 2006 5:42:04 -0800</pubDate>
    </item>

    <item>
      <title>Quality Control Manual</title>
      <description>(Policy) Management Commitment: Assigned responsibilities for the 
quality and reliability of the companys products or services, to each level 
of line management. Safety Plan Informative steps for a safe, clean orderly 
place of employment including safety equipment, and procedures to reduce injuries.
Qualification and Training of Personnel Company training program designed to assure 
that all personnel are adequately trained and qualified to perform their assigned 
tasks. Control of Manual Steps for controled serialized distribution to all 
necessary personnel, customers, and Government agencies.</description>
      <link>http://indieview.com</link>
      <enclosure url="http://www.governmentcontractsconsulting.com/qcmanual/QCmanual.mp3"       length="1116476" type="audio/mpeg"></enclosure>
      <pubDate>Fri, 5 August 2005 08:49:28 -0800</pubDate>
    </item>

    <item>
      <title>Quality Control Manual</title>
      <description>(Scope) The procedures contained in this manual are for the 
purpose of assuring a quality control system conforming to all customer requirements. 
This manual is not intended for use with, nor has it been approved for, the 
requirements of ISO 9001 thru 9004 or any other standards. Please make note that 
some of the specifications and standards called out in this manual, may have been 
superseded or cancelled, since the last manual revision. </description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:37:19 -0800</pubDate>
    </item>

    <item>
      <title>Quality Control Manual</title>
      <description>(Quality System Management)  Organization: Assigned responsibility 
including an example organization chart. Four sections on contracts administration 
with all of it's control procedures to be accomplished prior to planning release. 
Initial Quality Planning: Three pages of step by step instructions on planning and 
manufacturing engineering, production control, purchasing, quality assurance audit 
program, initial planning and the contract stage. Work Instructions: Complete 
information covering general and detailed requirements, manufacturing order, bill 
of materials, material procurement, and the distribution and control of the work 
instructions. Records: General requirements of the quality assurance department to 
maintain, including objective records of all documentation, traceability and record 
retention. Corrective Action: This is a system for informing suppliers of 
non-conformance and to initiate corrective action, including forms, periods, 
and status logs.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:37:19 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Drawings/Specifications) Control of Drawings/Specs: Steps to 
control drawings and specifications from the day of the order thru the completion 
of the contract including, engineering changes, revisions, stop orders, dispositions, 
drawing closeouts and documentation.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:37:19 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Control of Purchases) Responsibility: Three pages of information for 
the quality assurance manager and his responsibility for the control of purchases 
including bill of materials, certifications, qualified vendors, special process 
suppliers, and source inspection at vendors. Purchasing Data: Four sections on the basic 
purchasing document, acknowledgements, shipment records and seller inspection systems.
Laboratory Analysis: Three sections covering the control and tracability of raw material 
that requires lab analysis including segregation, and identification.
Vendor Surveillance: Steps for the quality control manager to assure that procured materials 
do meet the requirements including supplier facility visits, vendor control cards as well 
as corrective action.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:37:19 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Manufacturing Control) Receiving Inspection: Three pages of 
information for the receiving department to follow on all incoming materials.
Production Process/Fabrication: Eleven sections on in-process inspection of parts, 
components and subassemblies, throughout their intermediate stages of manufacture. 
End Item Inspection/Testing: Nine steps on final inspection to assure that all 
functions called for by the manufacturing order have been performed. Shipping: Complete 
instructions for the releasing inspector to assure that all labeling and packaging is 
adequate and to customer specifications. Non-Conforming Material Control: Step by step 
instructions for dealing with discrepant material including documentation, returns, 
dispositions and material review boards. Purchased Parts: Specifications to follow on 
the inspection of all high and low volume parts or materials purchased. 
Identification /Inspection Status: Five sections of procedures for identification of 
raw material, manufactured products and non-destructive tested items. Control/Limited 
Life Articles: Instructions for the Q.C. manager on handling limited life inspections 
on regular intervals.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:46:24 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Government/Contractor) Government Source Inspection: Covers procedures 
to follow when an inspection is to be performed at a subcontractor or vendor facilities. 
Government/Customer Owned Property: Describes system for providing adequate 
inspection, storage and maintenance of materials or tooling furnished by the 
Government or customer.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:46:24 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Exhibits) Forms/Charts/Tags: 15 different forms, charts and example 
tags which takes you thru all areas of quality control including an example Organization 
flow chart.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:50:18 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Calibration Procedures) Supplement Manual: This is a 6-page manual 
with 15-sections covering all areas of calibration which is built into the 
overall Q.C. manual.</description>
      <link>http://indieview.com</link>
      <pubDate>Sun, 7 August 2005 07:50:18 -0800</pubDate>
    </item>
    <item>
      <title>Quality Control Manual</title>
      <description>(Statistical Process Control) Supplement Manual Management Plan, 
12-pages with 9-sections and a Detailed Plan with a 3-page outline which is built into 
the overall Q.C. manual.</description>
      <link>http://indieview.com</link>
      <enclosure url="http://www.governmentcontractsconsulting.com/qcmanual/QCmanual.mp3"       length="1116476" type="audio/mpeg"></enclosure>
      <pubDate>Sun, 7 August 2005 07:58:18 -0800</pubDate>
    </item>
  </channel>
</rss>











